Skip to content

Prioritized labels

Drag to reorder prioritized labels and change their relative priority.

Other labels

  • stagedoing
    Melusina
    Work on the issue has been started.
  • value3
    Melusina
    Value (or impact) defines the extend to which Melusina or a certain area will benefit from the realization of the epic (3 high / 1 low)
  • value2
    Melusina
    Value (or impact) defines the extend to which Melusina or a certain area will benefit from the realization of the epic (3 high / 1 low)
  • value1
    Melusina
    Value (or impact) defines the extend to which Melusina or a certain area will benefit from the realization of the epic (3 high / 1 low)
  • size1
    Melusina
    the amount of work or conceptual challange of an epic (3 hight / 1 low).
  • size2
    Melusina
    the amount of work or conceptual challange of an epic (3 hight / 1 low).
  • size3
    Melusina
    the amount of work or conceptual challange of an epic (3 hight / 1 low).
  • stageready
    Melusina
    The issue or epic is actionable but not yet included in an iteration. It is adequately scoped and sufficiently clear defined for an iteration and no dependency blocks it.
  • stagefollow-up
    Melusina
    Summarize the result of the finished work in 1-3 sentences | Optionally, document new procedures or information in team docs | Write new insights or new work items, relevant for the parent epic, resulting from work on the issue as a comment to the parent epic | Re-consider the real weight of the issue after finishing
  • stageplan
    Melusina
    It is clear what work is necessary to realize the work item, how the final result and its components should look like (design in case of features) and if realization is realistically achieved in the turn of 1 iteration
  • stagenoise
    Melusina
    Issues and work that appeared during iteration. If possible those issues should not be solved during iteration but only prepared and organized for future planing